13/06/2016 Report to Tbilisi
Report to Tbilisi on an anniversary of disaster of June 13, 2015
Georgian Water and Power Company reports to the population of Tbilisi on recovery of infrastructure damaged at the time of disaster of June 13, 2015.
Special brigades of Georgian Water and Power were mobilized in the disaster area since morning of June 13, 2015 to conduct emergency works and large-scale recovery operations in force majeure mode.
The Company restored in the disaster area 3 kilometers of damaged water supply and sewerage networks of different diameters and replaced their part.
The company carried out:
rehabilitation of water supply networks in Tskneti-AKhaldaba and Kojori-Kiketi connecting roads;
rehabilitation of sewage networks in the damaged streets of Mtatsminda, Krtsanisi, Vake and Saburtalo districts;
rehabilitation of water supply and sewage networks in the whole territory of Zoo;
rehabilitation of wells and damaged valves in Tsavkisi ravine in the direction of Tabakhmela;
rehabilitation of damaged valves in Tabakhmela;
rehabilitation of sewage collector in Paliashvili street;
rehabilitation of sewage network from Tskhneti lower zone to Vake-Saburtalo tunnel;
arrangement of 8 new conduits in Tamarashvili, Kipshidze, Svanadze streets, Bugebi and Tskhneti overhead roads;
GWP carried out rehabilitation and restoration work in total of 50 sites in the disaster zone.
The expenses incurred by the Company made up about 3 000 000 lari.
26/07/2024 Georgia Global Utilities announces issuance of $300 Million Green Bonds
18/06/2024 ჯივიპის საგანგებო განცხადება - ჯივიპი მომხმარებლებს წყალს რეზერვუარების ალტერნატიული შევსებით მიაწვდის
17/06/2024 საგანგებო განცხადება - რა ვითარებაა წიწამურთან მდებარე მაგისტრალურ წყალსადენზე
07/06/2024 წყალმომარაგების სისტემის მოდერნიზაცია - Aqualia ჯივიპიში ევროპული სტანდარტების დანერგვას აგრძელებს
24/11/2023 Საოპერაციო ცენტრები წყალმომარაგების სერვისების მართვის ევროპული მოდელია - ხოსე მიგელ სანტოსი, gwp-ის გენერალური დირექტორი