15/04/2014 Georgian Water and Power is carrying out preventive works on the wells of water supply system
Georgian Water and Power company has been carrying out planned preventive works on the junction and distribution wells located in the streets of Tbilisi since April of the current year. This technical measure is one of the components to ensure uninterrupted water supply and sustainable operation of water supply and piping systems.
About 7 000 the junction and distribution wells are located on the networks of various diameters of the capital city. Multipurpose valves of different diameters are installed in each of them. Preventive works on the wells of the water supply system stipulate cleaning of the wells and repair or replacement of the damaged covers or shut-off valves if any, as well as restoration of the well’s damaged walls.
Georgian Water and Power will perform planned technical works on about 300 junction and distribution wells on a monthly basis and repair in accordance with the plan about 2 700 wells of the water supply system by the end of 2014.
26/07/2024 Georgia Global Utilities announces issuance of $300 Million Green Bonds
18/06/2024 ჯივიპის საგანგებო განცხადება - ჯივიპი მომხმარებლებს წყალს რეზერვუარების ალტერნატიული შევსებით მიაწვდის
17/06/2024 საგანგებო განცხადება - რა ვითარებაა წიწამურთან მდებარე მაგისტრალურ წყალსადენზე
07/06/2024 წყალმომარაგების სისტემის მოდერნიზაცია - Aqualia ჯივიპიში ევროპული სტანდარტების დანერგვას აგრძელებს
24/11/2023 Საოპერაციო ცენტრები წყალმომარაგების სერვისების მართვის ევროპული მოდელია - ხოსე მიგელ სანტოსი, gwp-ის გენერალური დირექტორი