05/08/2014 Obsolete water supply networks replaced on Utsera street
Population of Gldani and Nadzaledevi regions will be supplied drinking water way more smoothly in near future. Georgian Water and Power company replaces two sections of 900 mm main pipes passing in Utsera street. The process of water supply and sewage networks planned rehabilitation in different districts of Tbilisi is being carried out this year in full blast.
The networks renovation process reached completion phase. According to deputy technical director of Georgian Water and Power company Omar Gotsiridze two obsolete 900 mm cast iron main pipings have been completely replaced in Utsera street. The replaced pipes’ total length makes up 1500 meters. The obsolete branches of 300 meters were also renewed in Utsera street and 12 new shutdown and regulatory valves are being installed along with new water conduit wells.
Georgian Water and Power company is completely replacing obsolete and amortized underground communications in about 70 streets of Tbilisi. Total length of the networks under rehabilitation makes up more than 60 kilometers. The company has already completed the works in 60 streets of Didube-Chugureti, Saburtalo, Samgori, Nadzaladevi, Vake, Gldani and Mtatsminda districts.
26/07/2024 Georgia Global Utilities announces issuance of $300 Million Green Bonds
18/06/2024 ჯივიპის საგანგებო განცხადება - ჯივიპი მომხმარებლებს წყალს რეზერვუარების ალტერნატიული შევსებით მიაწვდის
17/06/2024 საგანგებო განცხადება - რა ვითარებაა წიწამურთან მდებარე მაგისტრალურ წყალსადენზე
07/06/2024 წყალმომარაგების სისტემის მოდერნიზაცია - Aqualia ჯივიპიში ევროპული სტანდარტების დანერგვას აგრძელებს
24/11/2023 Საოპერაციო ცენტრები წყალმომარაგების სერვისების მართვის ევროპული მოდელია - ხოსე მიგელ სანტოსი, gwp-ის გენერალური დირექტორი